Vehicle

2026 Hyundai® Kona Electric Preferred FWD w/Ultimate Package

Kilometres: 0 • VIN: KM8HE3A65TU038857 • Stock #: RKNET38857

MSRP:

$0

Rebates:

-$2,500

Dealer Price*:

$43,599

Vehicle Specification

Body TypeSUV
ConditionNew
EngineElectric
TransmissionAutomatic
DrivetrainFWD
Fuel TypeElectric
Exterior ColourAtlas White
Interior ColourBlack

Features

  • Heated Seats
  • Cooled Seats
  • Power Seats
  • Leather Seats
  • Push to Start
  • Backup Camera
  • Heated Steering
  • GPS Navigation
  • Keyless Entry
  • Sunroof
  • Moonroof
  • Premium Audio
  • Autonomy Features
  • Remote Start
  • Blind Spot Monitor

Hours

  • Sunday:11:00am - 5:00pm
  • Monday:9:00am - 7:00pm
  • Tuesday:9:00am - 7:00pm
  • Wednesday:9:00am - 7:00pm
  • Thursday:9:00am - 7:00pm
  • Friday:9:00am - 6:00pm
  • Saturday:9:00am - 6:00pm

Address and contact information

13251 Smallwood Place, Richmond, British Columbia V6V 1W8

(604) 278-6736

Dealer Price*

$43,599
1/26

Vehicle Location

Richmond Hyundai

13251 Smallwood Place, Richmond, British Columbia V6V 1W8

Contact Dealership for More Information

2026 Hyundai® Kona Electric

Preferred FWD w/Ultimate Package

Dealer Price*

$43,599

Confirm Availability

Features

Basic information

Stock #

VIN

Description

Richmond Hyundai has grown to become the largest volume Hyundai dealer in B.C. Throughout our tenure, we have strived to include the best possible customer service with top-notch repair/maintenance work and comprehensive new car, truck, minivan, and SUV inventories. Please contact our sales department to ensure accuracy and utilization of all available savings. Our enthusiastic and knowledgeable sales team are ready to listen to your list of wants and needs to help make sure you are getting the perfect vehicle match and always on hand to answer any questions you may have. In-house financing will help you in finding the best rates and help make plans to keep it within your ideal budget. Please stop by our dealership, located at 13251 Smallwood Pl, Richmond, BC and speak with one of our representatives today! * Vehicles may not be exactly as shown. All dealer rebates, discounts, factory incentives, prices, and interest rates are subject to change or end without notice as new retail incentive programs are announced.The following are not included in the sale price. The all-weather package is offered at $998. Applicable sales taxes (PST/GST), a $797 Deal Processing, and $675 Detail/Preparation apply. Dealer Number: D50720

Dealership Information

Sunday

11:00am - 5:00pm

Monday

9:00am - 7:00pm

Tuesday

9:00am - 7:00pm

Wednesday

9:00am - 7:00pm

Thursday

9:00am - 7:00pm

Friday

9:00am - 6:00pm

Saturday

9:00am - 6:00pm

Disclaimer

Price

*Prices shown may include additional dealer fees including, but not limited to, taxes, registration fees, finance charges,dealer installed options doc fees, add-ons, or transportation fees. Pricing of vehicles on this website does not include options that may have been installed at the Dealership. Dealer reserves right to correct any pricing error prior to final sale. Please contact dealer for more information.

Vehicle Information

While every effort has been made to ensure display of accurate data, including pricing data, the vehicle listings on this website may not reflect all accurate vehicle items. Accessories and color may vary. All Inventory listed is subject to prior sale. The vehicle photo displayed may be an example only. Vehicle Photos may not match exact vehicle. Please confirm vehicle price with dealer. All materials on this site are presented to the user "as is" without warranty of any kind, either express or implied.

Vehicle Availability

Vehicles shown on this site may not currently be in dealer's inventory. Additionally, vehicles shown may be in the inventory of a partner dealership or a dealership with shared ownership. If this is the case, this vehicle is not in our inventory but can be made available to you at dealer's location within a reasonable time.

Fuel/Energy Consumption Disclaimer

Any Fuel/Energy Consumption Ratings listed are for comparison purposes only. The vehicle's performance will vary based on how you drive, maintenance of your vehicles, driving conditions, battery pack age/condition (EV or hybrid only), and other factors. For additional information, visit:  https://fcr-ccc.nrcan-rncan.gc.ca/en

2026 Hyundai® Kona Electric

Preferred FWD w/Ultimate Package

Dealer Price*

$43,599

Confirm Availability